Falls Creek Pivot

Pull new power to existing well pump and install new Zimmatic Center Pivot with FieldNet remote automation

  • Date:May 2019
  • Client: Matt D.
  • Project Type: Pivot Install

About this Project

Customer was putting farm ground back into production.  He had a well with now power to it and no pump.  Project required a new mainline from pump to pivot and a new pivot irrigation system.

  • Bored under highway for 3″ electrical conduit
  • Set Transformer and installed 200 amp service equipment
  • Placed a 75 Horsepower Franklin Electric Submersible pump in well
  • Installed 75 horsepower Franklin Electric Variable Frequency Drive for Motor Control
  • Installed .3 mile *” PVC Mainline
  • Supplied and Installed new Zimmatic 8500 Center Pivot with GPS Guidance and Remote Operation
  • Connected to FieldNet for Advanced Remote Features

Contact Us

Contact Us
First
Last

(760) 937-2157

Office Hours

Monday - Friday: 8am - 5pm

We may be available for emergencies after hours - please leave a message!

Licensed and Bonded in California

CA license # 1073957