6″ PVC Mainline Replacement

Replace leaking mainline to pasture irrigation system

  • Date: May 2021
  • Project Type: Pipeline Project

About this Project

Owner stated existing above ground aluminum mainline was leaking badly.  Recommended replace with buried PVC mainline.

    • Cut into existing water supply
    • Adapted to 6″ PVC
    • Trenched mainline to pasture
    • Connected to riser valves
    • Fixed leaking riser valves
  • Replaced defective wheel line movers
  • Replace wheel line pipe with non leaking used pipe
  • New Aqua Burst sprinklers installed

Contact Us

Contact Us
First
Last

(760) 937-2157

Office Hours

Monday - Friday: 8am - 5pm

We may be available for emergencies after hours - please leave a message!

Licensed and Bonded in California

CA license # 1073957